Write labour time the way the job actually went

20.4.2022 · 1 min lukuaika

A round hour on every job makes the history useless. Ten minutes and a return visit are both real.

Labour time is not a performance score. It is how you learn which machines eat a morning, and whether a contractor’s visit matched the work.

Write the time on the job: diagnosis, the repair, the test, and the second visit if you had to come back with a part. A single “1 hour” on every line hides the treadmill that took half a day and the pin that took five minutes.

Include the waiting only if you mean it

Time spent on site waiting for a member to finish a set is real. Time the job sat in a queue is not labour. Keep those apart, or your cost of repair will look like a staffing problem.

If two people worked, say so. A job that needed two people to lift a stack is a different job from a console reset.

You do not need a timesheet system for this. You need the number on the work order before it is closed. Guessing at the end of the month is how every job becomes an hour.